Key work items have begun and TWI is already seeing progress on the 27-month Oak Ridge Trail and Restoration Project at our Dixon Waterfowl Refuge, which began in May 2014.
UIC engineering students help TWI design farm-based wetland
In spring 2014, a team of three students from the University of Illinois at Chicago’s College of Engineering helped design a farm-based wetland to capture nutrient runoff for TWI’s project in the Big Bureau Creek Watershed in north-central Illinois. The students turned the opportunity into their senior design project, while the partnership allowed TWI to complete a needed initial engineering design at no cost.